Case Study – The Neuk

Case Study – The Neuk

The installation of stunning FAKRO FTU electric operated roof windows was central to the design of the new living spaces.

Case Study – ZSL London Zoo

in 2017, ftp-v centre pivot roof windows in a combination were specified by architects WHARMBY KOZDON for a significant update to the ZSL LONDON ‘giants OF THE GALAPAGOS’ EXHIBIT SPACE.

Case Study – Hoardweel, Duns

In 2016 Mr Smith visited a self build show in Edinburgh and a long house design for a 11/2 story building caught his eye. With it being a new build house, this opened up an opportunity to use energy efficient SIP panels and to provide accommodation within a comfortable retirement home.

Case Study – Westhill Community Church

Westhill Community Church was a new, green field project in Aberdeenshire. Its highly contemporary style was designed for maximum functionality and to encourage use by the wider community. Natural light and climate controllability were the central considerations for the clients of McLean Architects during initial discussions – a common request for high ceiling, large space developments.

Case Study – Dumfries Baptist Church

In mid 2017 the brief was set to rebuild a busy community church in Dumfries, Dumfries and Galloway to make the most of a busy space much in need of modernisation, with the need for natural light being central to the success of the project.